Wednesday, April 28, 2021

29th April 2021

We go to the notaire to sign our piece of land over to Yul..




A trompe d'œil
In the same village.
(Its a blank wall, painted to look 3D)

Tuesday, April 27, 2021

23rd April 2021


I need a haircut 🤣😂🤣


The bath tiles reflected in the shower mirrors (the towel rack is over the bath)



Friday, April 23, 2021

22nd April 2021

Now its the big boys turn!

Side panel by Karl

Screwing in by Dave.


Holding the bugger straight....
Both of them!
The door is 120cm the length of the shower.


Weird reflections, mean we can do .... photographers legs and person in shower top....

Straight forward shower head and thermostat.

Eh Voilà...

Tuesday, April 20, 2021

Sunday, April 18, 2021

Saturday, April 17, 2021

18th April 2021

Finally I manage to get in on the act !







Various levels of sitting!


End of tiling day one.

17th April 2021

Day 4....Showergate..


Plumbing has had an overnight test and 🤞 no leaks!


Builders bum arrives!



And eats all the biscuits
😂🤣😂




End of day 4....
Now for the tiling 😱







Thursday, April 15, 2021

16th April 2021


Day 3




Super soldering!



15th April 2021

Day two...
Hole needed for drain.





Now for the beam underneath.




Cardboard cut out of shower base, easier to manoeuvre than the ceramic base!


Plumbing first steps!







Wednesday, April 14, 2021

14th April 2021

From Stone Man to Shower Power .......

First remove old shower.



Piece by piece







Shower has left the building!









End of day one...









Thursday, April 8, 2021

9th April 2021

The wall is finished!!

Dave digs out some soil to cover the top of the wall.


One happy chappie😁



On top.


Two men and their wall.
Thank you Yul & Dave a beautiful job very well done.