Cailho new land
Wednesday, April 28, 2021
29th April 2021
We go to the notaire to sign our piece of land over to Yul..
A trompe d'œil
In the same village.
(Its a blank wall, painted to look 3D)
Tuesday, April 27, 2021
23rd April 2021
I need a haircut 🤣😂🤣
The bath tiles reflected in the shower mirrors (the towel rack is over the bath)
Friday, April 23, 2021
22nd April 2021
Now its the big boys turn!
Side panel by Karl
Screwing in by Dave.
Holding the bugger straight....
Both of them!
The door is 120cm the length of the shower.
Weird reflections, mean we can do .... photographers legs and person in shower top....
Straight forward shower head and thermostat.
Eh Voilà...
Tuesday, April 20, 2021
21st April 2021
Day 4 in the Big Bother House!
20th April 2021
Start of day three, tiling😱.
End of day three,
last tile goes on.
PHEW!
Tomorrow grouting !
Sunday, April 18, 2021
19th April 2021
Another day at the tile face 😁
End of day two.
Saturday, April 17, 2021
18th April 2021
Finally I manage to get in on the act !
Various levels of sitting!
End of tiling day one.
17th April 2021
Day 4....Showergate..
Plumbing has had an overnight test and 🤞 no leaks!
Builders bum arrives!
And eats all the biscuits
😂🤣😂
End of day 4....
Now for the tiling 😱
Thursday, April 15, 2021
16th April 2021
Day 3
Super soldering!
15th April 2021
Day two...
Hole needed for drain.
Now for the beam underneath.
Cardboard cut out of shower base, easier to manoeuvre than the ceramic base!
Plumbing first steps!
Wednesday, April 14, 2021
14th April 2021
From Stone Man to Shower Power .......
First remove old shower.
Piece by piece
Shower has left the building!
End of day one...
Thursday, April 8, 2021
9th April 2021
The wall is finished!!
Dave digs out some soil to cover the top of the wall.
One happy chappie😁
On top.
Two men and their wall.
Thank you Yul & Dave a beautiful job very well done.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)